Central Polk Parkway from US Highway 17 to State Road 60
Project Details
Location
Bartow, FloridaClient
Florida Department of Transportation - Florida's Turnpike EnterpriseDelivery method
Bid-BuildProject Overview
Central Polk Parkway will be a new four-lane rural, divided limited access, All-Electronic Tolling facility in Polk County Florida. Prince is constructing just over 2.6 miles of new roadway from U.S. Highway 17 to State Road 60. Two new interchanges will be constructed at U.S. 17 and SR 60 in addition to widening, milling and resurfacing.
This project includes:
- 673,983 cubic yards of excavation
- 1,918,829 cubic yards of embankment
- 182,446 square yards of roadway base
- 44,659 tons of asphalt
- 20,000 linear feet of storm pipe
- 15,000 linear feet of barrier walls
- 87,000 square feet of mechanically stabilized earth walls
- 8,766 cubic yards of bridge concrete
- 21,860 linear feet of concrete beams
- 34,168 linear feet of concrete pile
Key Stats


Join us
Careers at Prince



.jpg?h=1350&iar=0&w=2400)