At Orlando International Airport South Terminal C, Prince performed a complete mechanically stabilized earth (MSE) wall installation. The MSE walls, built as part of a Turner-Kiewit JV Landside Civil construction manager at risk contract, included excavation, backfill, precast concrete and drainage.
The project includes:
- 820 linear feet of drainage pipe
- 17 drainage structures
- 125,330 square feet of mechanically stabilized earth walls
- 5,190 linear feet of precast concrete traffic railing
- 1,605 linear feet of median barrier wall
- 7,200 square feet of bridge approach slabs