US Route 27 Everglades Canal Bridges
Project Details
Location
South Bay, FloridaClient
Florida Department of TransportationDelivery method
Bid-BuildProject Overview
In Palm Beach County, Prince is making improvements along U.S. Route 27, including two new twin-bridge structures where the road crosses the Everglades Agricultural Area (EAA) Reservoir Inflow/Outflow Canal.
The project also includes mechanically stabilized earth walls, concrete barrier walls, guardrails, pavement markings, rumble strips, signs and utility work.
The purpose of the EAA Reservoir Phase is to construct a 240,000 acre-foot EAA Reservoir and 6,500 acre-foot stormwater treatment area.


Join us
Careers at Prince



.jpg?h=1350&iar=0&w=2400)