OWNER: Florida Department of Transportation
VALUE: $ 21.4 million
ENGINEER: FDOT
YEAR COMPLETED:  On-going

This 800-day, $21.4 million project consists of the reconstruction of US 301 from a two-lane roadway to a four-lane divided roadway for 1.9 miles from just south of Raulerson Ranch Road to just north of Bradley Road. The project includes approximately 25,000 linear feet of storm drainage, removal of an existing two-lane bridge and construction of a new four-lane bridge. It also includes replacing one signalized intersection, adding one new signalized intersection, construction of four retention ponds, and removing approximately 100,000 cubic yards of unsuitable material.

loading
×