OWNER: Florida Department of Transportation
VALUE: $ 62 million
ENGINEER:  HDR
YEAR COMPLETED:  2012

The US 301 project commenced on November 17, 2008 and consisted of widening US 301 from two lanes to six lanes for a six mile stretch of highway between Gibsonton Drive and CR 672 in Hillsborough County for The Florida Department of Transportation. Additionally, the project consisted of relocating the utility infrastructure and the construction of two bridges.

loading
×