OWNER: Florida Department of Transportation
VALUE: $ 20.8 million
ENGINEER:  Atkins
YEAR COMPLETED:  Ongoing

During this 700-day, $20.8 million project, the Prince-Atkins design-build team will be performing the work for District Five of the FDOT. The scope of the project includes adding loop ramps in each quadrant of the interchange, reconstructing one mile of US 27 with the addition of two lanes, and widening SR 50 by two lanes for .7 miles.  Prince will remove and reconstruct the US 27 Bridge over SR 50 and make various improvements to the project corridor.

 