OWNER: Florida Department of Transportation
VALUE: $ 21.9 million
ENGINEER:  GAI
YEAR COMPLETED:  2016

During this 939-day, $21.9 million contract, Prince widened and rehabilitated over four miles of four-lane rural roadway to six lanes, from Barry Road to US 192 in Polk and Lake counties, including widening the US 27 bridge over US 192. Key project features included five-foot sidewalks, sound walls, segmental block retaining walls, and improved drainage features.

loading
×