OWNER: Florida Department of Transportation District Three
VALUE: $ 38.6 million
ENGINEER: Wantman Group
YEAR COMPLETED:  Ongoing

During this 640-day, $38.6 million project, Prince will widen to six lanes SR 8 (I-10) from Escambia Bay Bridge to east of SR 281 (Avalon Blvd.) in Santa Rosa County, Florida. Prince will also correct substandard geometric curves on SR 8, replace the SR 8 bridges over SR 281(which also includes correcting existing vertical clearance deficiencies,) modify  interchange ramps as necessary to meet current criteria, address subsoil geotechnical issues, reconstruct SR 281 within the interchange area, and raise the profile grade, modifying drainage and high-mast lighting as necessary.

loading
×