OWNER: Florida Department of Transportation
VALUE: $23.5 million
ENGINEER: Genesis CE&I
YEAR COMPLETED: 2008

On this project Prince removed the existing two lane roadway and constructed a new four-lane roadway with curbed median and sidewalks for 5.2 miles. The project included two box culverts, highway lighting, multiple retention ponds, specialized cast-in-place drainage structures, under-drain, 12,000 linear feet of storm sewer and 10,000 linear feet of 42” DI water main. FDOT District 1 nominated this project for the 2008 FTBA “Best in Construction” award.