OWNER: Florida Department of Transportation
VALUE: $ 16.8 million
ENGINEER:  C3TS
YEAR COMPLETED:  2011

Prince’s team designed and reconstructed SR 50, a major arterial road, to convert it from four lanes to six lanes. This road serves as a connector between Clermont and Orlando for daily commuters and was funded by the ARRA of 2009. The project was 3.056 miles in length and is located in Winter Garden, Florida, just west of SR 429.

loading
×