OWNER: Orlando-Orange County Expressway Authority
VALUE: $ 22 million
ENGINEER:  Jacobs Engineering Group, Inc.
YEAR COMPLETED:  2012

During this 17-month, $20.8 million project, Prince widened .8 miles of the existing toll road and two bridges, constructed numerous retaining walls, and installed aesthetic treatments on structural elements throughout the site. Prince performed this work for the Orlando-Orange County Expressway Authority’s (OOCEA) improvements to the East-West Expressway (SR 408) from Oxalis Drive to Goldenrod Road.

loading
×