OWNER: Florida Department of Transportation
VALUE: $ 19.8 million
ENGINEER:  PBS&J
YEAR COMPLETED:  2012

On this Design-Build project, Prince constructed 3.8 miles of roadway and coordinated the relocation of existing utilities in the corridor. Prince was awarded this ARRA project, located in Clermont Florida, in September of 2009, to convert the roadway from four to six travel lanes.

loading
×