OWNER: Florida Department of Transportation, District 1
VALUE: $ 7.9 million
ENGINEER: Target Engineering Group
YEAR COMPLETED:  Ongoing

This 600-day, $7.9 million project encompasses 1.5 miles of complete urban roadway reconstruction of SR 17, from SR 544 (Scenic Highway) to US 17 (Hinson Avenue). Work includes decorative lighting installation, storm drain modifications, and water and sewer main improvements. Finished roadway consists of a three-line highway enclosed by Type F curb and six foot sidewalks. Storm drainage system includes over 7,900 linear feet of A2000 storm drain pipe of various sizes and 98 precast storm drain structures. Utility work consists of over 14,000 linear feet of PVC water, sewer, and force main pipe installations. This project demands a complex MOT setup with multiple detours. Due to the urban and residential location of the project, close communication with the PIO and the community are necessary for an overall successful product.