Recent and ongoing projects

SHOW ALL   •   Bridges   •   Heavy & Highway   •   Innovative Project Delivery   •   Site Development
heavy-highway
SR 429 Wekiva Parkway from US 441 to North of Ponkan Road

For this 660-day, $56.2 million project, Prince constructed SR 429 (Wekiva Parkway) from US 441 to north of Ponkan Road in Orange County, Florida.

Read More...
heavy-highway
SR 15 (Hoffner Road)

During this 1300-day, $37.1 million project, Prince will widen and reconstruct 3.811 miles of SR 15 (Hoffner Ave.) from Lee Vista Boulevard to Conway Road in Orange County, Florida.

Read More...
heavy-highway
SR 50 from Dean Road to E of Avalon Park Blvd., Orange & Brevard Counties

During this 950-day, $67.8 million project, Prince widened and reconstructed R 50 from E of Dean Road to E of Avalon Park Boulevard from a four-lane rural roadway to a six-lane urban divided highway.

Read More...
heavy-highway
Bruce B. Downs (CR 581)

This 3.55-mile, $36,148,000 project reconstructed a four-lane rural roadway to an eight-lane urban roadway.

Read More...
heavy-highway
Poinciana Boulevard

By the conclusion of this $6.2 million project, we constructed 2.5 miles of new roadway as well as milled & resurfaced 2.5 miles of existing roadway.

Read More...
heavy-highway
SR 17 (10th St. S.) Polk County

This 600-day, $7.9 million project encompasses 1.5 miles of complete urban roadway reconstruction of SR 17, from SR 544 (Scenic Highway) to US 17 (Hinson Avenue).

Read More...
heavy-highway
US 301/Tampa Bypass Canal to Fowler

This 800-day, $21.4 million project consists of the reconstruction of US 301 from a two-lane roadway to a four-lane divided roadway for 1.9 miles from just south of Raulerson Ranch Road to just north of Bradley Road.

Read More...
heavy-highway
I-275/SR 93 Hillsborough County

During this 750-day, $29 million project, Prince widened and rehabilitated over three miles of roadway as well as sixteen bridges, including the bridge that spans the Hillsborough River.

Read More...
heavy-highway
I-275 Tampa

Prince is widening I-275 in Tampa, Florida from its intersection with US 41 to the I-75/I-275 interchange. The 20-month project consists of widening 6.0 miles of the existing interstate from four to six lanes.

Read More...
bridges,heavy-highway
I-75 Tampa (SR 56 to S. Fowler)

During this 1500-day, $94.7 million job, Prince is widening and reconstructing 11.4 miles of I-75 through Tampa, Florida, including replacing 3 bridges, widening 16 bridges, constructing an Acrow temporary bridge, and installing 85,000 LF of storm drainage.

Read More...
heavy-highway
North Cattlemen Road

During this 540-day, $14.5 million project, Prince widened the two-lane section of the existing roadway to four lanes and extended the four-lane roadway section north to DeSoto Road.

Read More...
heavy-highway
US 301 Hillsborough County

The US 301 project commenced on November 17, 2008 and consisted of widening US 301 from two lanes to six lanes for a six mile stretch of highway between Gibsonton Drive and CR 672 in Hillsborough County for The Florida Department of Transportation.

Read More...