Recent and ongoing projects

SHOW ALL   •   Bridges   •   Heavy & Highway   •   Innovative Project Delivery   •   Site Development
innovative-project-delivery
SR 30 (US 98) from Emerald Bay Dr. to Tang-O-Mar Dr.
Read More...
innovative-project-delivery
SR 8 (I-10) Design-Build Multilane from the Escambia Bay Bridge to East of SR 281 (Avalon Boulevard), Santa Rosa County

During this 640-day, $38.6 million project, Prince will widen to six lanes SR 8 (I-10) from Escambia Bay Bridge to east of SR 281 (Avalon Blvd.) in Santa Rosa County, Florida.

Read More...
heavy-highway
SR 429 Wekiva Parkway from US 441 to North of Ponkan Road

During this 660-day, $56.2 million project, Prince will construct SR 429 (Wekiva Parkway) from US 441 to north of Ponkan Road in Orange County, Florida.

Read More...
heavy-highway
SR 15 (Hoffner Road)

During this 1300-day, $37.1 million project, Prince will widen and reconstruct 3.811 miles of SR 15 (Hoffner Ave.) from Lee Vista Boulevard to Conway Road in Orange County, Florida.

Read More...
heavy-highway
SR 50 from Dean Road to E of Avalon Park Blvd., Orange & Brevard Counties

During this 950-day, $67.8 million project, Prince is widening and reconstructing SR 50 from E of Dean Road to E of Avalon Park Boulevard from a four-lane rural roadway to a six-lane urban divided highway.

Read More...
innovative-project-delivery
US 27 Design-Build from Barry Road to US 192

During this 939-day, $21.9 million contract, Prince will widen and rehabilitate over four miles of four-lane rural roadway to six lanes, from Barry Road to US 192 in Polk and Lake counties, including widening the US 27 bridge over US 192.

Read More...
innovative-project-delivery
SR 50 Design-Build Winter Garden

Prince's team designed and reconstructed SR 50, a major arterial road, to convert it from four lanes to six lanes.

Read More...
innovative-project-delivery
SR 25/US 27 Design-Build Clermont

On this Design-Build project, Prince is responsible for the design and construction of 3.8 miles of roadway widening and reconstruction as well as coordinating the relocation of existing utilities in the corridor.

Read More...
heavy-highway
Bruce B. Downs (CR 581)

This 3.55-mile, $36,148,000 project to reconstruct a four-lane rural roadway to an eight-lane urban roadway will last for 815 days. Other work includes widening the southbound Cypress Creek Crossing bridge from two lanes to four, and constructing a brand new four-lane northbound bridge.

Read More...
heavy-highway
Poinciana Boulevard

During this 304-day, $6.2 million project, Prince will construct 2.5 miles of new roadway as well as mill & resurface 2.5 miles of existing roadway. Three new stormwater retention ponds will be constructed along with a 123 foot single-span pedestrian bridge. Polyester polymer concrete overlay will be applied on the two existing roadway bridges.

Read More...
innovative-project-delivery
I-75 Design-Build CR 54 to SR 52, Pasco County

This project widens I-75 from north of CR 54 to north of SR 52, as well as improvements to SR 52 from west of Old Pasco Road to east of Corporate Lake Boulevard in Pasco County.

Read More...
innovative-project-delivery
Veteran’s Expressway Design-Build Segment 5

This 1,050-day, $51 million job will expand Veteran’s Expressway from the Sugarwood Mainline Toll Plaza to south of Van Dyke Road in Hillsborough County, and will accommodate future capacity needs as well as provide operational and safety improvements by turning the existing 4-lane road into an 8-lane divided highway.

Read More...
- PAGE 1 OF 5 -