OWNER: Osceola County
VALUE: $ 6.2 million
ENGINEER: Atkins
YEAR COMPLETED: On-Going

During this 304-day, $6.2 million project, we will construct 2.5 miles of new roadway as well as mill & resurface 2.5 miles of existing roadway.  Three new stormwater retention ponds will be constructed along with a 123 foot single-span pedestrian bridge. Polyester polymer concrete overlay will be applied on the two existing roadway bridges (this is only the second time this product has been used in Florida.) Also, a Gabion mattress abutment armoring system will be installed for one of the existing bridges over Shingle Creek.

 