OWNER: Dragados-USA
VALUE: $ 86 million
ENGINEER:  AECOM
YEAR COMPLETED:  2014

<span style=”font-variant: small-caps;”>Prince</span> reconstructed SR84, widened I-595, and constructed reversible express lanes along 4.3 miles of the I-595 Express Project Corridor, beginning at the I-595/I-75 Interchange and ending at the Nob Hill Road Overpass. During the three year project, <span style=”font-variant: small-caps;”>Prince</span> performed all the roadway construction activities on Segments A and B for the 595 Express Design-Build team.