OWNER: Florida Department of Transportation
VALUE: $ 153 million
ENGINEER: Parsons Brinkerhoff, Inc.
YEAR COMPLETED:  Ongoing

The Project includes the design and construction necessary to convert the existing High Occupancy Vehicle (HOV) lanes to Managed Lanes in both the northbound and southbound directions of a 7.4-mile section of I-95 from north of Commercial Blvd to south of SW 10 St in Broward County, FL.  The Express Lanes will implement congestion based toll pricing along the corridor. Project improvements include milling, resurfacing, and overbuilding of the existing I-95 travel lanes and shoulders, roadway widening, guardrail and barrier wall installation, drainage improvements, construction of two new ramp bridges, replacement of pedestrian bridge over I-95, widening of 16 bridges, temporary and permanent retaining walls, sound barrier walls, sign structures, tolling gantries and associated infrastructure including toll equipment buildings, Intelligent Transportation System (ITS), and ramp (metering) signals for 4 interchanges from Cypress Creek Road to Sample Rd.

 

 

loading
×